Thursday 23 May 2013

Block 1: 23 May
Hi all,

I apologise for the late Blogs. I have been extremely busy at work, Now that I am also working for a Medical Supply Co.
Now I will get everyone up to date on the work I have done as well as the new projects I am currently working on.

ABLUTIONS BLOCK N02 (below)

Just to give everyone a better understanding of what it is I am working within terms of this Blue Waters Project.
This is the existing Ablutions block No.2
As you can all see it is very basic with just the basic needs of the people.

The overall presentation of this Ablution block is very poor and in a great need of a complete remodel.
The paint has been sun beaten and is starting to peel off.






ABLUTION BLOCK No2.1 (below)
Here is the latest and revision of the Ablution block.
As you can see there have been changer to the showers at now we have catered for a disabled shower unit. This change in design has been amended to both the male and female ablutions.
An extra hand basin has also been added to the male’s ablutions now allowing for four men to wash their hands at the same time.
 

CS

No comments:

Post a Comment