Block 1: 11 June
FRONT ENTRANCE No.1 (below)
This was a very simple task of extending the existing roof of the front entrance of the Blue Waters Project to cover the car entrance.
In this drawing shown you can see the photos showing the existing building and how the roof cover only extends to the start of the road by the car entrance.
Given this extension will allow for better security and for a more pleasing/ welcoming greeting.
POWER, WATER SUPPLY No.1 (below)
Here again we come back to the Site.
I was asked to indicate the areas and positions of the new Water, Electricity and TV cables.
Blue: indicating the water supply that starts from the front entrance and travels along the road to three new points. Two of the water supplies lead to the Cavan Camp site. While the third branches off to the right to the new proposed pool area.
Red: Indicates the Electricity that starts from the front entrance as well, travailing along the road to the same indicated spots as the water points. This will give all the Caravans power to their caravans for light and cooking requirements. The red supply that branches off to the right is supply power to the pool pump.
Green: Indicates the TV cables that will supply all Cabins and Chalets with DSTV and other channels, this however does not include the camp site area.
No comments:
Post a Comment